Low Cost Small Capacity 400KG/H Wood Pellet Production Plant For Wood Mushroom-Stick Crop Waste
- CountryGuizhou Province, China
- DateMay 2019
- NameWood pellet making plant
- Capacity400KG/H
- Total Power412kw
- Workshop size about this project1934m²
- Main Machines in this complete line
Wood chipper with factory price, competitive price hammer mill for sawdust, high drying efficiency biomass rotary dryer, hot sale small commercial wood pelletizing equipment, screener, cyclone dust collector, cooler, packing machine, etc.
- Guiding Price130,000 USD
- Customer's Main Raw materialWood, mushroom-stick, crop stalk, peanut shell
- Customer's Feed Pellet Size6-8mm
- Packing System(Y/N)Manual packing system
- Boiler System(Y/N)Coal-fired boiler
- Customized Scheme(Y/N)It's a customized scheme for our customer
- ApplicationProduce 1,000 tons of biomass pellet fuel per year
- The install period3 weeks
- Number of installation engineers assisted by our company1
- The operate worker in this line5
- Our company provides drawing details1.Flow Chart; 2. install drawings; 3. pit drawings; 4. operating instruction 5.the production construction design drawings; 6. steel structure full drawing and steel material list; 7. plan and sectional layout graph of workshop drawings; 8. steel structure construction drawings; 9. the detailed steel structure drawings and material list; 10. Diagram of floor; 11. roof and wall reserved hole; 12. Oscillatory coefficients of equipment.
- Customer Visit (Y/N)Once
- Details of Production LineThe client invested 130,000 USD (approximately RMB 800,000) to rent an idle local plant (plants and other supporting facilities have been completed) to build a small scale 400kg/h biomass pellet fuel production line for wood mushroom-stick crop stalk waste peanut shell. The project covers an area of 1934m² and is mainly equipped with a biomass pellet fuel processing line that produces fuel pellets with annually 1,000 tons. There are 15 employees in the project, 8 of whom are boarding and lodging in the factory, and 7 are not living in the factory. The staff of this project are all in one-shift system, and the production is 300 days a year, and the production is 8 hours a day.The site selection of the project has a good geographical advantage. The water supply, power supply and communication facilities of the project site are complete, and the transportation is convenient. It meets the requirements of relevant land use planning. At the same time, the pollution generated during the project operation period will have little impact on the surrounding environment after measures are taken for treatment.
If you have any questions, please contact our Executive Manager and we will get back to
you as soon as possible